Installation and maintenance instructions Logano GA124 special gas-fired boiler • Issue 04/2005
4 Scope of delivery
z Check packaging on delivery for damage.
z Check delivery for completeness.
1
On pallet
Component Qty Packaging
Boiler, complete 1 1 pallet
B-kit components:
- supply manifold
1 1 foil package
1
- 30 psi relief valve
- temperature/pressure gauge
- 90° elbow (1" NPT)
- 90° elbow (3/4" NPT)
- boiler drain (3/4")
- screw-in feet (4) (M10x51)
- wall penetration for
horizontal flue system
1 separate
packaging unit
- technical documents 1 1 foil package
Tab. 2 Scope of delivery
Optional Accessories
1
Unit
Logamatic 2107 control 1
Heat circulation pump 1
Cleaning brush 1
Vertical flue system 1
Tab. 3 Accessories
1
Accessories available by separate order