EasyManua.ls Logo

Bunn ITCB Series - Electrical Install; Initial Start-Up

Bunn ITCB Series
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Bunn-O-Matic Corporation
5
Electrical Install
Anelectricianmustprovideelectricalserviceasspeciedinconformancewithalllocal,state,and
federal electrical codes.
The ITCB is a dual voltage unit. There is a voltage switch located on the back of the brewer. The
brewer is wired from the factory with a 2-wire+ground power cord and plug rated for 120VAC at
15amps.For208VACor240VACcongurations,the3-wire+groundpowercordmustbeordered
fromBUNN:P/N:01699.0000.Thetechnicianmustsupplya20amprated,4-wireplug.
For 120V brewers:
Step 1: Plugbrewerintothepowersource.
For 120/208VAC or 120/240VAC brewers:
Step 1: Remove the rear panel.
Step 2: Disconnect the 2-wire+ground cord from the terminal block.
Step 3: Feed the 3-wire+ground power cord through the strain relief.
Step 4: Attach the wire ends to the terminal block.
Step 5: Attach the ground wire to connector below the terminal block.
Step 6: Check that all connections are tight.
Step 7:Placethedualvoltagetoggleswitchinthecorrectposition.
Step 8: Tighten the strain relief and replace the rear panel.
Step 9:Plugtheunitintothepowersource.
Initial Start-Up
Step1:PlacethemainpowerswitchintotheOnposition.
WhenthemachineisturnedonandtheEnableBrewOn/Offswitchispressed,itwillbegintollthetank.
Afterthetankllsthemachinewillautomaticallybegintheheatingcycle.Thiswilltakeapproximately20minutes.
Once the water temperature has reached the programmed Brew Lockout temperature it will display the ready screen.
The machine will continue to heat until it reaches its programmed shut-off temperature.
PLEASE WAIT
TANK FILLING
HEATING
WATER TEMP XXXXº
READY TO BREW
WATER TEMP: 205º

Related product manuals