5
BOILER SIZE
5006B 5007B 5008B 5009B 5010B 5011B 5012B 5013B 5014B 5015B 5016B 5017B 5018B 5019B 5020B 5021B 5022B 5024B 5026B
CARTONS, PACKAGES OR BUNDLES
7 S Steam Trim Carton (Steam Boilers Only - Includes PA404 Pressure Limit Control) 4 Sizes - One Per Boiler
1 1 1 1 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
2 --- --- --- 1 1 1 --- --- --- --- --- --- --- --- --- --- --- --- ---
3 --- --- --- --- --- --- 1 1 1 1 1 1 1 1 1 --- --- --- ---
4 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 1 1 1 1
67 BC-2 Low Water Cut-off Carton (Steam Boilers Only) One Per Boiler
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7 W Water Trim Carton (Water Boilers Only - Includes L4006A Temp. Limit Control) 3 Sizes - One Per Boiler
2 1 1 1 1 1 1 --- --- --- --- --- --- --- --- --- --- --- --- ---
3 --- --- --- --- --- -- 1 1 1 1 1 1 1 1 1 1 1 1 1
4 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 1 1
64 Low Water Cut-off Carton (Water Boilers Only) One Per Boiler
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
U
8
Complete Jacket Carton Assembly - One Per Boiler
c
9
1
Gas Train Cartons (By Gas) 2 Sizes - One or Two Per Boiler
c
9
1
1 1 1 --- --- --- --- --- --- 2 1 --- --- --- --- --- --- --- ---
c
9
2
--- --- --- 1 1 1 1 1 1 --- 1 2 2 2 2 2 2 2 2
THERM. Controls Carton(s) (Manual Ignition. - 100% Shutoff - 24V.) 1 Size - One or Two Per Boiler
Natural 1 1 1 1 1 1 1 1 --- 2 2 2 2 2 2 2 2 2 ---
OP Controls Carton(s) (By Gas) (Manual Ign. - 100% Shutoff - 24V. - Nat. - 120V. LP) 1 Size - One or Two Per Boiler
Natural --- --- --- --- --- --- --- --- 1 --- --- --- --- --- --- --- --- -- 2
Propane 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2
U
HCP
1
Plain Heater Cover Plate (Not furnished on Water Boiler Ordered With Two Tankless Heaters) One Per Boiler
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
U
HCP
2
Tapped (¾” NPT) Heater Cover Plate (Not Furnished on Water Boiler Ordered With Tankless Heater(s) One Per Boiler
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CANADIAN
EQUIPMENT CHECK LIST
INSPECT SHIPMENT carefully for any signs of damage. All equipment is carefully manufactured, inspected and packed.
Our responsibility ceases upon delivery of Boiler to carrier in good condition. Any claims for damage or shortage in
shipmentmustbeledimmediatelyagainstthecarrierbytheconsignee.Noclaimsforvariancesorshortageswillbe
allowedbyBoilerManufacturer,unlesspresentedwithinsixty(60)daysafterreceiptofequipment.
SECTION I - EQUIPMENT CHECK LIST - Page 2
SECTION II - GENERAL INFORMATION - Page 7
SECTION III - INSTALLATION INSTRUCTIONS - Page 8
SECTION IV - OPERATION - Page 41
SECTIONV-SERVICE-Page65
SERVICE RECORDS - Page 72
SECTION VI - REPAIR PARTS - Page 73
APPENDIXA-FIGURES-Page105
APPENDIXB-TABLES-Page108
SECTION I – EQUIPMENT CHECK LIST (continued)