EasyManua.ls Logo

Burnham V8 Series - Page 32

Burnham V8 Series
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
Figure 12: Recommended Piping for Combination Heating and Cooling (Refrigeration) System
To perform a long term pressure test including the
boiler, ALL trapped air must rst be removed from
the boiler.
A loss of pressure during such a test, with no
visible water leakage, is an indication that the boiler
contained trapped air.

Table of Contents

Related product manuals