EasyManua.ls Logo

BWT Bewamat 25A - Installation

BWT Bewamat 25A
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
AUS
6 Installation
Place and align the softening column with control
valve behind the cabinet.
Run the the brine hose from the inside though the
bore to the outside and insert it as far as it will go
(a depth of about 15 mm) in the connection angle.
Put the grey cover onto the left side of the control
valve.

Other manuals for BWT Bewamat 25A

Related product manuals