Forces on the building
LOAD &
FORCES
F
1
2946N
F
e
1129N
F
h
h
2300mm.
770N
2000mm.
870N
1800mm.
960N
1700mm.
1050N
1500mm.
1120N
1450mm.
1190N
Fig. 2
The tower is fixed to the floor and to the wall with M10x90mm (Class 8.8) Glue bolts.
Two bolts in the wall and three in the floor.
The given load forces applies for the total force when two bolts are used both places.
Please make sure the wall and floor materials can withstand the given loads.
Install the tower
3.1 Tower positioning
The tower is the first component to install. Dependent on the quality and straightness
of the wall- and ground material, the tower placement may need corrections.