EasyManua.ls Logo

Cape Dory 270 - Page 12

Default Icon
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
43. ___________ ___________ Check all clevis and cotter pins for security. Be sure the
locking nuts on the turnbuckles are secure. Tape all
potential chafe points.
44. ___________ ___________ *Tune rigging to proper tensions (including bobstay on 28
and 30).
45. ___________ ___________ *Attach booms, sheets, blocks, oars, reefing lines toping
lifts, etc.
46 .___________ __________ Wire bow and deck lights.
MISCELLANEOUS CHECKLIST:
47. ___________ ___________ *Fill water tank(s) and check operation of all pumps and
drains.
48. ___________ ___________ Fill alcohol tank (27, 28 and 30). Check for leaks and test
operation of stove. See manufacturer’s literature on all
stoves.
49. ___________ ___________ Water test ports and hatches.
50. ___________ ___________ *Recheck all thru hulls, valves, seacocks, hose clamps,
hoses, and stuffing boxes.
51. ___________ ___________ *Bend on sails.
52. ___________ ___________ *Interior appointments complete.
53. ___________ ___________ Optional equipment installed and operational.
54. ___________ ___________ Owner’s packet, ship’s papers, and ignition key given to
owner.
55. ___________ ___________ Checklist (warranty registration) ready for mailing to
factory.
I CERTIFY THAT I HAVE READ AND UNDERSTAND THE CONDITIONS AS LISTED IN
CAPE DORY YACHTS’ WRITTEN LIMITED WARRANTY.
Owner ________________________________Dealer__________________________________
Date ________________________ WITHIN SEVEN DAYS OF LAUNCHING,
RETURN CHECKLIST TO:
Cape Dory Yachts, Inc.
160 Middleboro Avenue
East Taunton, Mass. 02718
www.capedory.org - 12 -

Table of Contents