Installation
Receiving the Machine 
Inspect Shipment
1.
Inspect for shipping damage while machine is still on shipping conveyance. If machine 
appears to be damaged or has been torn loose from its anchorage, have it examined by 
transportation inspectors before removal. Forward claim papers directly to transportation 
company. 
Manufacturer is not responsible for any damage incurred in transit.
 
2.
Check all items against shipping list. Immediately notify the nearest Carrier representative if 
any item is missing. 
3.
To prevent loss or damage, leave all parts in original packages until beginning installation. 
All openings are closed with covers or plugs to prevent dirt and debris from entering 
machine components during shipping. A full operating oil charge is placed in the oil sump 
before shipment.
CAUTION
CAUTION
!
Do not open any valves or loosen any connections. The standard 19XL machine 
is shipped with a full refrigerant charge. Some machines may be shipped with a 
nitrogen holding charge as an option.