Install Machine Supports 
Install Standard Isolation 
Figure 10 and Figure 11 show the position of support plates and shear flex pads, which 
together form the standard machine support system.
Install Accessory Isolation (if required) 
Uneven floors or other considerations may dictate the use of accessory soleplates (supplied 
by Carrier for field installation) and leveling pads. Refer to Figure 10 and Figure 12.
Level machine by using jacking screws in isolation sole-plates. Use a level at least 24-in. 
(600 mm) long. 
For adequate and long lasting machine support, proper grout selection and placement is 
essential. Carrier recommends that only premixed, epoxy type, non-shrinking grout be used for 
machine installation. Follow manufacturer’s instructions in applying grout. 
1.
Check machine location prints for required grout thickness. 
2.
Carefully wax jacking screws for easy removal from grout. 
3.
Grout must extend above the base of the soleplate and there must be no voids in grout 
beneath the plates.
4.
Allow grout to set and harden, per manufacturer’s instructions, before starting machine.
5.
Remove jacking screws from leveling pads after grout has hardened.