CONTENTS
Page
SAFETY CONSIDERATIONS ................. 1
INTRODUCTION ............................ 4
ABBREVIATIONS AND EXPLANATIONS ...... 4
CHILLER FAMILIARIZATION ................ 5-7
Chiller Information Plate .................... 5
System Components ........................ 5
Cooler ..................................... 5
Condenser ................................. 5
Motor-Compressor .......................... 5
Control Panel .............................. 5
Factory-Mounted Starter (Optional) .......... 7
Storage Vessel (Optional) ................... 7
REFRIGERATION CYCLE .................... 7
MOTOR AND LUBRICATING OIL
COOLING CYCLE ........................ 7,8
LUBRICATION CYCLE ...................... 8
Summary .................................. 8
Details ..................................... 8
Oil Reclaim System ......................... 8
PRIMARY OIL RECOVERY MODE
SECONDARY OIL RECOVERY METHOD
STARTING EQUIPMENT .....................8-10
Unit-Mounted Solid-State Starter
(Optional) ................................ 9
Unit-Mounted Wye-Delta Starter
(Optional) ............................... 10
CONTROLS ...............................10-43
Definitions ................................ 10
ANALOG SIGNAL
DISCRETE SIGNAL
General ................................... 10
PIC II System Components ................. 10
CHILLER VISUAL CONTROLLER (CVC)
INTEGRATED STARTER MODULE (ISM)
CHILLER CONTROL MODULE (CCM)
OIL HEATER CONTACTOR (1C)
OIL PUMP CONTACTOR (2C)
HOT GAS BYPASS CONTACTOR RELAY (3C)
(Optional)
CONTROL TRANSFORMERS (T1, T2)
CVC Operation and Menus ................. 14
GENERAL
ALARMS AND ALERTS
CVC MENU ITEMS
BASIC CVC OPERATIONS (Using the Softkeys)
TO VIEW STATUS
OVERRIDE OPERATIONS
TIME SCHEDULE OPERATION
TO VIEW AND CHANGE SET POINTS
SERVICE OPERATION
PIC II System Functions ................... 32
CAPACITY CONTROL
ECW CONTROL OPTION
CONTROL POINT DEADBAND
DIFFUSER CONTROL
PROPORTIONAL BANDS AND GAIN
DEMAND LIMITING
CHILLER TIMERS
OCCUPANCY SCHEDULE
Safety Controls ............................ 33
Shunt Trip (Option) ........................ 35
Default Screen Freeze ..................... 35
Ramp Loading ............................. 35
Capacity Override ......................... 35
High Discharge Temperature Control ....... 35
Oil Sump Temperature Control ............. 35
Page
Oil Cooler ................................. 36
Remote Start/Stop Controls ................ 36
Spare Safety Inputs ........................ 36
Spare Safety Alarm Contacts .............. 36
Refrigerant Leak Detector ...................36
Condenser Pump Control .................. 36
Condenser Freeze Prevention .............. 37
Tower Fan Relay Low and High ............. 37
Auto. Restart After Power Failure ........... 37
Water/Brine Reset ......................... 37
RESET TYPE 1
RESET TYPE 2
RESET TYPE 3
Demand Limit Control Option ................38
Surge Prevention Algorithm ................ 38
Surge Protection .......................... 39
Lead/Lag Control .......................... 39
COMMON POINT SENSOR INSTALLATION
CHILLER COMMUNICATION WIRING
LEAD/LAG OPERATION
FAULTED CHILLER OPERATION
LOAD BALANCING
AUTO. RESTART AFTER POWER FAILURE
Ice Build Control .......................... 41
ICE BUILD INITIATION
START-UP/RECYCLE OPERATION
TEMPERATURE CONTROL DURING
ICE BUILD
TERMINATION OF ICE BUILD
RETURN TO NON-ICE BUILD OPERATIONS
Attach to Network Device Control .......... 42
ATTACHING TO OTHER CCN MODULES
Service Operation ......................... 43
TO ACCESS THE SERVICE SCREENS
TO LOG OUT OF NETWORK DEVICE
HOLIDAY SCHEDULING
START-UP/SHUTDOWN/RECYCLE
SEQUENCE .............................44,45
Local Start-Up ............................. 44
Shutdown Sequence ....................... 45
Automatic Soft Stop Amps Threshold ....... 45
Chilled Water Recycle Mode ................ 45
Safety Shutdown .......................... 45
BEFORE INITIAL START-UP ................46-58
Job Data Required ......................... 46
Equipment Required ....................... 46
Using the Optional Storage Tank
and Pumpout System .................... 46
Remove Shipping Packaging ............... 46
Open Oil Circuit Valves .................... 46
Tighten All Gasketed Joints and
Guide Vane Shaft Packing ................ 46
Check Chiller Tightness .................... 46
Refrigerant Tracer ......................... 46
Leak Test Chiller .......................... 48
Standing Vacuum Test ..................... 48
Chiller Dehydration ........................ 51
Inspect Water Piping ....................... 51
Check Optional Pumpout Compressor
Water Piping ............................ 51
Check Relief Valves ....................... 51
Inspect Wiring ............................. 51
Carrier Comfort Network Interface .......... 52
Check Starter ............................. 52
MECHANICAL STARTER
BENSHAW, INC. REDISTART MICRO
SOLID-STATE STARTER
Oil Charge ................................ 53
2

Table of Contents

Other manuals for Carrier 19XR

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Carrier 19XR and is the answer not in the manual?

Carrier 19XR Specifications

General IconGeneral
BrandCarrier
Model19XR
CategoryChiller
LanguageEnglish

Related product manuals