Machine must be installed in a location not accessible to the public and protected against unauthorized personnel.
Engineers working on electric or refrigeration components must be authorized and fully qualified.
All installation parts must be maintained by personnel in charge to avoid material deterioration and injuries.
Inspect unit for damage or missing parts. File a claim if damage is detected or shipment is incomplete.
Step-by-step guide to adjusting water flow rate using the control valve and monitoring pressure drop.
Essential checks before starting the chiller, including circulation pumps and refrigerant leaks.
Guidelines for commissioning, supervised by a qualified engineer, and initial operational tests.
Instructions for keeping the unit clean, checking connections, and inspecting insulation.
Procedure to verify correct refrigerant charge using sight glass and subcooling measurements.
General principles for handling refrigerants, including inspections, leak repair, and oil management.
Procedure for recharging with HFC-407C refrigerant, emphasizing leak detection and proper charging methods.
Checklist for shipping damage, unit level, power supply, wiring, terminals, and cables integrity.
Checklist for pump interlock, oil level, leak checks, and refrigerant leaks before initiating unit start-up.
Measure pressure drop and plot on curve to determine flow rate, adjusting control valve if necessary.
Instructions to perform the QUICK TEST and check user menu configuration for various operating parameters.