1
1. GENERAL NOTES TO INSTALLER
CARRIER split room air conditioner has been carefully designed and manufactured under strict
Quality Control conditions.
Therefore you are completely responsible for proper installation completion and operation of the air
conditioner.
Carefully read the manual carefully before proceeding with the installation to ensure correct
installation. This manual describes installation instructions to help ensure trouble free operation and
extended life of the air conditioner.
Make sure all accessory parts are with the system before beginning installation.
You will need the following tools during installation:
1. Standard screw driver 10.
Flare tool set
2. Phillips head screw driver 11.
Pipe bender
3. Hole core drill 12.
Hexagonal wrench
4. Tape measure 13.
Torque wrench
5. Water level 14.
Vacuum pump
6. Pipe clamp 15.
Gas leak detector
7. Pipe cutter 16.
Manifold gauge
8. Spanner 17.
Thermometer
9. Reamer 18.
Electrical circuit tester
After completion of installation, perform a run test and give the customer full
instructions on the correct operation of the air conditioner including:
• Turning the unit on and off. • Removal and cleaning of the air filters.
• Functions of the remote control. • Re-installation of air filters after cleaning
Leave the owner manual with the customer so that it can to be used during operation of the air
conditioner.
Leave the installation manual with the customer so that it can be used for any service and
maintenance operations.
Advise the customer to the tips of energy saving while operating the air conditioner
as mentioned in the owner’s manual.