Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53500199-01 Printed in U.S.A. Form 50KC-4-6-02SI Pg CL-1  11-18 Replaces: 50KC-4-6-01SI
UNIT START-UP CHECKLIST (REMOVE AND USE FOR JOB FILE) 
I. PRELIMINARY INFORMATION
MODEL NO ____________________________________________
JOB NAME_____________________________________________
SERIAL NO ____________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit (Y/N) _____
Verify installation of outdoor-air hood (Y/N) _____
Verify that condensate connection is installed per instructions   (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor-air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat (Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage  L1-L2_____________ L2-L3_____________ L3-L1_____________
Compressor Amps 1 L1   _____________ L2   _____________ L3   _____________
Compressor Amps 2 L1   _____________ L2   _____________ L3   _____________
Supply Fan Amps L1   _____________ L2   _____________ L3   _____________
TEMPERATURES
Outdoor-Air Temperature  _____________ °F DB (Dry Bulb)
Return-Air Temperature  _____________ °F DB  _____________ °F Wb (Wet Bulb) 
Cooling Supply Air Temperature  _____________ °F
PRESSURES
Refrigerant Suction CIRCUIT A _____________ PSIG 
CIRCUIT B _____________ PSIG
Refrigerant Discharge  CIRCUIT A _____________ PSIG 
CIRCUIT B _____________ PSIG
Verify Refrigerant Charge using Charging Charts (Y/N) _____
GENERAL
Economizer minimum vent and changeover settings to job requirements (if equipped) (Y/N) _____
Verify smoke detector unit shutdown by utilizing magnet test (Y/N) _____
NOTE:  To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in preced-
ing sections of this Installation Instruction document.