PLUG
CAP
BOX DRAIN TUBE (BLUE)
COLLECTOR BOX TUBE (GREEN)
BOX EXTENSION TUBE
COLLECTOR BOX TUBE (PINK)
BOX RELOCATED HERE
COLLECTOR BOX DRAIN TUBE
(BLUE AND WHITE STRIPED)
INDUCER HOUSING
DRAIN TUBE (VIOLET)
COLLECTOR BOX
EXTENSION TUBE
CONDENSATE
TRAP
A00214
Fig. 12--Horizontal Right Tube Configuration
NOTE: In (anada, installations shall be in accordance with
current NSCNGPIC Installation Codes andor local codes.
NOTE: The auxilial_- junction box (J°Box) MUST be relocated to
opposite side of _/rnace casing. (See Fig. 12.) See Electrical
Connection section _br J-Box relocation.
CONDENSATE TRAP LOCATION
The condensate tlap must be removed from the factor-installed
blower shelf location and relocated in selected application location
as shown in Fig. 2 or 12.
To relocate condensate trap from the blower shelf to desired
location, perform the fbllowing:
1. Remove 3 tubes connected to condensate trap.
2. Remove tlap fi'om blower shelf by gently pushing tabs inward
and rotating trap.
3. Install casing hole filler cap (factov-supplied in loose parts
bag) into blower shelf hole where tlap was remo_ ed.
--> (ARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal in3u D'
or death.
Casing hole filler cap must be installed in blower shelf hole
when condensate trap is relocated.
4. Install condensate trap into casing hole by inserting tube
connection stubs through casing hole and rotating until tabs
snap into locking position.
5. Fill unused condensate trap casing holes with plastic filler
caps (_Sctoryosupplied in loose parts bag)
12
(ONDENSATE TRAP TL BING
NOTE: See Fig 12 or robe routing label on main furnace door to
check for proper connections
1. Collector Box Drain Tube
a Remove _ctoryoinsta!led plug from LOWER collector box
drain robe (blue and white striped label).
b. Install removed clamp and plug into UPPER collector box
&ain tube (blue label) which was previously connected to
condensate tlap.
c. Connect LOWER collector box drain robe (blue and white
striped label) to condensate trap. Tube does not need to be
cut.
d. (lamp robe to prevent any condensate leakage.
2. Inducer Housing Drain Tube
a. Remove fhctoryoinstalled cap and clamp from LOWER
inducer housing drain connection.
b. Remove and discard UPPER (molded) inducer housing
&ain robe which was previously connected to condensate
tlap.
c. Install cap and clamp on UPPER inducer housing &ain
connection where molded &ain robe was removed.
d. Use inducer housing &ain extension tube (violet label and
factory-supplied in loose parts bag) to connect LOWER
inducer housing &ain connection to condensate trap.
e. Detem?ine appropriate length, cuk and connect robe to
condensate trap.
_ Clamp robe to prevent any condensate leakage.
3. Relief Port Tube
Refer to Pressure Switch Tubing section _br connection
procedure.