59TP6C: Installation, Start-up, Operating and Service and Maintenance Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
12
A230046
A230047
Fig. 10 – Horizontal Right Trap Configuration
(Appearance may vary)
A230048
A230049
Fig. 11 – Horizontal Left Configuration
(Appearance may vary)
To Relocate the Condensate Trap:
• Remove the knockout or plug in the casing for the condensate trap.
• Install the grommet in the casing when required for direct-vent
horizontal applications.
• Orient the furnace in the desired position.
• Allow for 2 in. (51 mm) of clearance underneath the furnace for the
condensate trap and drain line.
• Fig. 10 shows the condensate trap and tubing before and after
relocation in the horizontal right position.
• Fig. 11 shows the condensate trap and tubing before and after
relocation in the horizontal left position.
• Refer to the appropriate figure to begin the trap conversion.
• Refer to Condensate Drain section for information how to install the
condensate drain.
A170135
Fig. 12 – Example of Field Drain Attachment