Do you have a question about the Carrier 59TP6C and is the answer not in the manual?
Overview of different furnace installation orientations.
Overview of air requirements for various venting applications.
Air requirements for ventilated systems in the US.
Details on standard and known air infiltration methods.
Condensate trap installation for upflow, downflow, and horizontal.
Drain connection for upflow and downflow orientations.
Specific steps for left-side condensate drain connection.
Condensate drain connection for horizontal orientation.
Installation requirements for upflow orientation.
Guidelines for connecting supply air ducts.
Guidelines for connecting return air ducts.
Instructions for connecting the bottom return air inlet.
Instructions for connecting the side return air inlet.
Installation requirements for downflow orientation.
Using leveling legs and placement relative to cooling equipment.
General guidelines for duct system design and installation.
Procedures for sizing return ductwork.
Guidelines for acoustical treatment of ductwork.
Requirements and procedures for 115-V and 24-V wiring connections.
Instructions for installing electrical boxes.
Installing sensors, accessories, and thermostat configuration.
General venting considerations and termination placement.
Specific venting requirements for Canada.
Recommendations for supporting vent terminations.
Details on direct vent, ventilated, and non-direct vent systems.
Rules for vent terminations in inside corners.
Guidelines for determining the proper location for vent termination.
Sizing pipes and approved materials for venting.
Insulation guidelines for vent and air pipes.
Procedures for installing vent terminations (roof, concentric, two-pipe).
Installation requirements for sidewall vent terminations.
Examples and rules for calculating vent system lengths.
Using the on-board control for programming.
Using NFC and mobile app for control adjustments.
Procedures for replacing the control board.
General procedures for furnace start-up and safety checks.
Procedures for checking furnace safety controls.
General maintenance tasks and safety precautions.
Overview of electrical controls and wiring.
How to retrieve stored fault codes from the control board.
Instructions for cleaning or replacing the air filter.
Procedures for cleaning the blower motor and wheel.
Steps for cleaning burners and the flame sensor.
Procedures for servicing the hot surface igniter.
Procedures for cleaning the condensate drain and trap.
Procedures for cleaning heat exchangers.
Steps to winterize the furnace.
Operation sequences for two-stage heating modes.
Operation sequences for various cooling modes.
Operation for dehumidification and continuous fan modes.
Operation sequence for heat pump applications.
Guide for troubleshooting furnace issues.
Procedures for gas adjustment and firing rate verification.
Lists of replaceable components by group.
Furnace model identification details.
Overview of different furnace installation orientations.
Overview of air requirements for various venting applications.
Air requirements for ventilated systems in the US.
Details on standard and known air infiltration methods.
Condensate trap installation for upflow, downflow, and horizontal.
Drain connection for upflow and downflow orientations.
Specific steps for left-side condensate drain connection.
Condensate drain connection for horizontal orientation.
Installation requirements for upflow orientation.
Guidelines for connecting supply air ducts.
Guidelines for connecting return air ducts.
Instructions for connecting the bottom return air inlet.
Instructions for connecting the side return air inlet.
Installation requirements for downflow orientation.
Using leveling legs and placement relative to cooling equipment.
General guidelines for duct system design and installation.
Procedures for sizing return ductwork.
Guidelines for acoustical treatment of ductwork.
Requirements and procedures for 115-V and 24-V wiring connections.
Instructions for installing electrical boxes.
Installing sensors, accessories, and thermostat configuration.
General venting considerations and termination placement.
Specific venting requirements for Canada.
Recommendations for supporting vent terminations.
Details on direct vent, ventilated, and non-direct vent systems.
Rules for vent terminations in inside corners.
Guidelines for determining the proper location for vent termination.
Sizing pipes and approved materials for venting.
Insulation guidelines for vent and air pipes.
Procedures for installing vent terminations (roof, concentric, two-pipe).
Installation requirements for sidewall vent terminations.
Examples and rules for calculating vent system lengths.
Using the on-board control for programming.
Using NFC and mobile app for control adjustments.
Procedures for replacing the control board.
General procedures for furnace start-up and safety checks.
Procedures for checking furnace safety controls.
General maintenance tasks and safety precautions.
Overview of electrical controls and wiring.
How to retrieve stored fault codes from the control board.
Instructions for cleaning or replacing the air filter.
Procedures for cleaning the blower motor and wheel.
Steps for cleaning burners and the flame sensor.
Procedures for servicing the hot surface igniter.
Procedures for cleaning the condensate drain and trap.
Procedures for cleaning heat exchangers.
Steps to winterize the furnace.
Operation sequences for two-stage heating modes.
Operation sequences for various cooling modes.
Operation for dehumidification and continuous fan modes.
Operation sequence for heat pump applications.
Guide for troubleshooting furnace issues.
Procedures for gas adjustment and firing rate verification.
Lists of replaceable components by group.
Furnace model identification details.












Loading...