EasyManuals Logo

Carrier ASPAS1CCL025 User Manual

Carrier ASPAS1CCL025
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #3 background imageLoading...
Page #3 background image
Table of Contents
Carrier Liquid-cooled 25 kW Generator
Carrier 1
INTRODUCTION................................................IFC
Read this Manual Thoroughly......................................IFC
Operation and Maintenance ........................................IFC
How to Obtain Service ................................................IFC
SAFETY RULES ....................................................2
Section 1 — GENERAL INFORMATION ............4
1.1 Generator ..............................................................4
1.2 Transfer Switch ....................................................4
1.3 Automatic System Operation ................................4
1.4 Generator AC Connection Systems........................4
1.5 Main Circuit Breaker ............................................4
1.6 Generator Fuel System ..........................................5
1.7 Engine Protective Devices ......................................5
1.8 Unpacking ............................................................6
1.9 Lifting the Generator ............................................6
1.10 Specifications ........................................................6
1.11 Fuel Consumption ................................................7
1.12 Reconfiguring the Fuel System for LP Vapor..........7
1.13 Engine Oil Recommendations ..............................7
1.14 Coolant Recommendations....................................8
1.15 Before Installation ................................................8
Section 2 — INSTALLATION ............................8
2.1 Standby Generator Installation ............................8
2.2 Generator Location................................................9
2.3 Generator Mounting and Support ........................9
2.4 Basic Standby Electric System ..............................9
2.5 Emergency Circuit Isolation Method......................9
2.6 Total Circuit Isolation Method ............................10
2.7 Grounding the Generator ....................................10
2.8 Generator AC Neutral Connections......................10
2.9 Transfer Switch Signal Connections....................10
2.10 Battery Installation ..............................................10
2.11 Preparation Before Start-Up ................................11
Section 3 OPERATION ................................12
3.1 Control Console Components..............................12
3.2 Manual Transfer and Startup..............................14
3.3 Engine Governor Adjustments ............................14
3.4 Retransfer and Shutdown....................................14
3.5 Automatic Operation ..........................................14
3.6 Weekly Exercise Cycle..........................................15
3.7 Control Board DIP Switch Settings ....................15
Section 4 — MAINTENANCE ..........................16
4.1 Maintenance Performed by Authorized
Service Facilities ..................................................16
4.2 Exhaust Manifold Procedure ..............................16
4.3 Intake Manifold Procedure ..................................16
4.4 Cylinder Head Procedure ....................................16
4.5 Cooling System....................................................17
4.6 Overload Protection for Engine DC
Electrical System ................................................17
4.7 Checking Fluid Levels ........................................17
4.8 Maintenance Owner/Operator
Can Perform ........................................................17
4.9 Miscellaneous Maintenance ................................19
4.10 Scheduled Maintenance ......................................21
Section 5 — TROUBLESHOOTING ..................24
Section 6 — NOTES ........................................25
Section 7 — ELECTRICAL DATA ....................28
Section 8 — EXPLODED VIEWS AND
PARTS LISTS ..............................36
Section 9 — INSTALLATION DIAGRAM ..........51
Section 10 — WARRANTY ...............................52

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Carrier ASPAS1CCL025 and is the answer not in the manual?

Carrier ASPAS1CCL025 Specifications

General IconGeneral
BrandCarrier
ModelASPAS1CCL025
CategoryInverter
LanguageEnglish

Related product manuals