© 2022 Carrier. All rights reserved.
 
Edition Date: 10/22
Catalog No: R4A4S-R4A5S-02SI
Replaces:R4A4S-01SI
R4A4S, R4A5S: Installation Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
10
Final Checks
IMPORTANT: Before leaving job, be sure to do the following:
1. Ensure that all wiring is routed away from tubing  and sheet metal
edges to prevent rub-through or wire pinching. 
2. Ensure  that  all wiring  and  tubing  is  secure  in  unit  before  adding
panels and covers. Securely fasten all panels and covers. 
3. Tighten service valve stem caps to 1/12-turn past finger tight.
4. Leave Owner’s Manual with owner. Explain system operation and
periodic maintenance requirements outlined in manual. 
5. Fill out Dealer Installation Checklist and  place in customer file.
Repairing Refrigerant Circuit 
When  breaking  into  the  refrigerant  circuit  to  make  repairs,  or for  any
other purpose, the following procedures shall be used. 
1. Safely remove the refrigerant using a recovery pump  certified  for
flammable refrigerants. 
2. Purge the refrigerant circuit with nitrogen gas. 
3. Evacuate the refrigerant circuit to 1500 microns. 
4. Break  vacuum  with  a  nitrogen  purge  of  the  refrigerant  circuit
ensuring that the outlet of the vacuum pump is not near a potential
ignition source. 
5. Open the circuit by cutting or brazing. 
CARE AND MAINTENANCE
For  continuing  high  performance  and  to  minimize  possible  equipment
failure, periodic maintenance must be performed on this equipment. 
Frequency of maintenance may vary depending upon geographic areas,
such as coastal applications. See Owner’s Manual for information.