Table 68 -- Staged Gas Configuration
EXPANSION
STAGED GAS CONFIGS
Staged Gas Heat Type
Max Cap Change per Cycle
S.Gas DB min.dF/PID Rate
St.Gas Temp. Dead Band
Heat Rise dF/sec Clamp
LAT Limit Config
Limit Switch Monitoring?
Limit Switch High Temp
Limit Switch Low Temp
Heat Control Prop. Gain
Heat Control Derv. Gain
Heat PID Rate Config
J RANGE J UNITS I CCN POINT [ DEFAULTS
0-4
5 - 45
0-5
0 - 5 ^F
0.05 - 0.2
0 - 20 ^F
Yes/No
110 - 180 dF
100 - 170 dF
0 - 1,5
0 - 1,5
60 - 300 sec
HTSTGTYP
HTCAPMAX
HT MR DB
HT SG DB
HTSGRISE
HTLATLIM
HTLIMMON
HT LIMHI
HT LIMLO
HT PGAIN
HT DGAIN
HT,SGPIDR
*Some configurations are model number dependent.
O*
45*
0.5
2
0.06
10
Yes
170*
160*
11
90
Staged Gas Heat Staging -- Different unit sizes will control
heat stages differently based on the amount of heating capacity
included. These staging patterns are selected based on the mod-
el number. The selection of a set of staging patterns is con-
trolled via the heat stage type configuration parameter (HT.ST).
As the heating capacity rises and falls based on demand, the
staged gas control logic will stage the heat relay patterns up and
down, respectively. The Heat Stage Type configuration selects
one of 4 staging patterns that the stage gas control will use. In
addition to the staging patterns, the capacity for each stage
is also determined by the staged gas heating PID control. There-
fore, choosing the heat relay outputs is a function of the capaci-
ty desired, the heat staging patterns based on the heat stage type
(HT.ST) and the capacity presented by each staging pattem. As
the staged gas control desired capacity rises, it is continually
checked against the capacity of the next staging pattern.
When the desired capacity is greater than or equal to the
capacity of the next staging pattern, the next heat stage is select-
ed (Run Status-+VIEW-+HT.ST = Run Status-+VIEW-+
HT.ST + 1). Similarly, as the capacity of the control drops, the
desired capacity is continually checked against the next lower
stage. When the desired capacity is less than or equal to the next
lower staging pattem, the next lower heat stage pattern is select-
ed (Run Status-+VIEW-+HT.ST = Run Status-+VIEW-+
HT.ST- 1). The first two staged gas heat outputs are located on
the MBB board and outputs 3, 4, 5, and 6 are located on
the SCB board. These outputs are used to produce 5 to 11 stages
as shown in Tables 69A and 69B. The heat stage selected (Run
Status-+VIEW-+HT.ST) is clamped between 0 and the maxi-
mum number of stages possible (Run Status-+
VIEW-+H.MAX) for the chosen set of staging patterns. See
Tables 70-73.
INTEGRATED GAS CONTROL BOARD LOGIC -- All gas
heat units are equipped with one or more integrated gas control
(IGC) boards. This board provides control for the ignition sys-
tem for the gas heat sections. On size 020-050 low heat units
there will be one IGC board. On size 020-050 high heat units
and 051 and 060 low heat units there are two IGC boards. On
size 051 and 060 high heat units there are three IGC boards.
When a call for gas heat is initiated, power is sent to W on the
IGC boards. For standard 2-stage heat, all boards are wired
in parallel. For staged gas heat, each board is controlled sepa-
rately. When energized, an LED on the IGC board will be
turned on. See Table 74 for LED explanations. Each board will
ensure that the rollont switch and limit switch are closed. The
induced-draft motor is then energized. When the speed of the
motor is proven with the Hall Effect sensor on the motoc the
ignition activation period begins. The burners ignite within
5 seconds. If the burners do not light, there is a 22-second delay
before another 5-second attempt is made. If the burners still do
not light, this sequence is repeated for 15 minutes. After
15 minutes have elapsed and the burners have not ignited then
heating is locked out. The control will reset when the request
for W (heat) is temporarily removed. When ignition occurs, the
IGC board will continue to monitor the condition of the rollout
switch, limit switches, Hall Effect sensor, and the flame sensor.
Forty-five seconds after ignition has occurred, the IGC will
request that the indoor fan be turned on. The IGC fan output
(IFO) is connected to the indoor fan input on the MBB which
will indicate to the controls that the indoor fan should be turned
on (if not already on). If for some reason the overtemperature
limit switch trips prior to the start of the indoor fan blowec on
the next attempt the 45-second delay will be shortened by
5 seconds. Gas will not be interrupted to the burners and heat-
ing will continue. Once modified, the fan delay will not change
back to 45 seconds unless power is reset to the control. The
IGC boards only control the first stage of gas heat on each gas
valve. The second stages are controlled directly from the MBB
board. The IGC board has a minimum on-tflne of 1 minute. In
modes such as Service Test where long minimum on times are
not enforced, the 1-minute tflner on the IGC will still be fol-
lowed and the gas will remain on for a minflnum of 1 minute.
Table 69A -- Staged Gas Heat -- 48AJ,AK,AW,AY Units
UNIT SIZE HEAT CAPACITY UNIT MODEL NO. Configuration-+HEAT-+SG.CF
POSITION NO. 5 -+HT.STENTRY VALUE
Low S 1= 5 STAGE
020-035
High T 2 = 7 STAGE
Low S 1= 5 STAGE
036-050
High T 1 = 5 STAGE
Low S 4 = 11 STAGE
051,060
High T 3 = 9 STAGE