EasyManua.ls Logo

Case CX17B - Boom Maintenance Standards; Arm

Case CX17B
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. ATTACHMENT DIMENSIONS
3-4
3.1.2 BOOM MAINTENANCE STANDARDS
(1) Clearance of pin and bushing on boom section
Clearance of pin and bushing on boom section
-The tolerance for bushing inside diameter means the dimension after fitting of it into place.
-The part number for pins may be changed owing to improvement, use them only for reference.
D
C
B
A
Unit : mm (in)
Pos. Item Pin part No.
Standard dimensions Clearance
Remedy
Pin dia.
Tolerance
on pin dia.
Tolerance
on bushing
bore dia.
Standard
value
Standard
value for
repair
Service-
ability limit
A
Boom foot
PU02B01212P1
ł35
(1.3780)
0.02
0.05
(-0.0008)
(-0.0020)
+0.05
0
(+0.0020)
( 0 )
0.02~
0.10
(0.0008~
0.0039)
0.7
(0.028)
1.0
(0.039)
Replace
bushing
or pin
B
Boom cylin-
der
(Head side)
PU02B01168P1
0.02
0.08
(-0.0008)
(-0.0031)
+0.18
+0.05
(+0.0071)
(+0.0020)
0.07~
0.26
(0.0028~
0.0102)
C
Boom cylin-
der
(Rod side)
PU02B01170P1
0.02
0.05
(-0.0008)
(-0.0020)
+0.18
+0.05
(+0.0071)
(+0.0020)
0.07~
0.23
(0.0028~
0.0091)
D
Arm cylin-
der
(Head side)
PF02B01022P1
0.03
0.08
(-0.0012)
(-0.0031)
+0.18
+0.05
(+0.0071)
(+0.0020)
0.08~
0.26
(0.0031~
0.0102)

Related product manuals