ā 17 ā
2. C-In line test termination (Termination command)
This command is for the termination of the TOKEN.
[Operation]
Press 8 2 0 #2 .
3. C-In line CN (connection) type message transmission test
This command will check the communication by CN type message. This operaton
will compare with transmission data and reception data after sending data to the
reception machine.
Before performing this transmission test, set the ID No. & Baud rate by the Item
No.1 operation.
[Operation]
Press 8 3 n #2 . (whereas n = Machine ID No.)
ID No. = 0 ~ 9 (ID No.0 is for the host computer.)
(10~32 are not possible to use.)
Note 1: To stop the test, press #2 key.
Note 2: To perform this test, the reception machine is necessary. Before operat-
ing this test, perform the CN type receprion command on the reception
machine.
[Print sample]
820 OK
[Print sample (Normal end) ]
831 OK
[Print sample (Abnormal end) ]
831 ER83 01-0000
Error block counter No.
Error machine ID No.
Error code