EasyManua.ls Logo

CENTURION SYSTEMS VANTAGE 400 - 8 Critical Installation Checklist

Default Icon
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
page 26 www.CentSys.com
8. Critical Installation Checklist
SECTION 8 CRITICAL INSTALLATION CHECKLIST
The following is a list of critical requirements that must be adhered to in order to ensure
reliable operation of your VANTAGE operator(s):
• Ensure that the Wall Bracket is securely anchored
• Make sure that the operator’s maximum stroke is being utilised
• Only use V-Series cable for the installation
• Leave a 350mm long loop in the cable
• Fit an electric gate lock if the leaf width is greater than 3 metres
• Ensure that the opening and closing angles conform to the installation guidelines
• Ensure that your gate and operator(s) are equipped to deal with Wind Loading
(refer to the Table 6 and 7 on page 14)
Never run the operator directly from the battery! Doing so will cause
damage to the operator. Only run the operator from the V-Series
Controller.