Installation
GB
Installation
12
10
230V
35
Boiler installation
- x the boiler support bracket to the wall and align it
- hang the boiler onto the bracket
- remove the front boiler casing
- if installing with the hydraulic bar Kit (optional): unscrew the two
A screws and remove the xing bracket 37. Connect valves and hydraulic
bar connections to the boiler
- if installing with a hydraulic Kit for the rst installation, provide the connection
- check the seal of both the water and gas connections and get rid of any leaks.
The backow preventer drain outlet 35, the heating safety valve 12 and the domestic hot water valve 10 must be connected to a waste water
pipe.
37
A
A

Table of Contents

Other manuals for CHAFFOTEAUX NIAGARA C 25 CF

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CHAFFOTEAUX NIAGARA C 25 CF and is the answer not in the manual?

CHAFFOTEAUX NIAGARA C 25 CF Specifications

General IconGeneral
BrandCHAFFOTEAUX
ModelNIAGARA C 25 CF
CategoryBoiler
LanguageEnglish

Related product manuals