EasyManua.ls Logo

CircuPool SJ40 - Installation Checklist

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
□ Cell housing installed and glued into pipe work.
O-Ring seated in Cell Housing, Cell aligned with and inserted into Cell
Housing, and Cell Cap screwed in place hand tight (Do not use wrench).
Control Module is affixed to wall and wired correctly.
Cell cable connected to Control Module.
You have checked and confirmed that Control Module switches ON
and OFF concurrently with filter pump (or when used with variable
speed pumps is only energized during high water flow.)
You have checked all connections and joints for leaks.
Sufficient salt has been added and fully dissolved and circulated
throughout pool water.
Pool has properly balanced water chemistry.
INSTALLATION CHECKLIST

Related product manuals