EasyManua.ls Logo

Circutor REC 4 - Maintenance and Testing; Routine Maintenance Procedures

Circutor REC 4
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PENDIENTE DE VALIDACIÓN
5. MAINTENANCE
The RCCB must be checked frequently.
Test sequence (Figure 10):
1.- Press the TEST (T) key.
2.- Check that the RCCB jumps to OFF position.
TEST
OFF
TEST
OFF
REC4-2P model
REC4-2P model manufactured from 01/23.
REC4-C-2P model
Figure 10: RCCB Test Sequence.
In the event of a Test sequence failure, contact the after-sales service.
17
Instruction Manual
REC4