Figure 4: Clearances Required Around the Chassis
6.0 in. (15.24 cm) rear
clearance for air
intake/exhaust.
4Chassis1
More 6.0 in. (15.24 cm)
rear clearance for removal
and installation of power
supplies and fan modules.
56.0 in. (15.24 cm) front
clearance for air
intake/exhaust.
2
20.01 in. (50.82 cm)
Chassis depth.
3
Hardware Installation Guide for Cisco 8200 Series Routers
11
Prepare for Installation
Clearance Requirements