6
Note Use only with listed Information Technology Equipment (ITE) equipment. For more
information on ITE equipment, refer to article 645 of the latest National Electrical Code
(NEC).
4 Unpacking the AP
To unpack the access point, follow these steps:
Step 1 Unpack and remove the access point and the mounting accessories, from the shipping box.
Step 2 Re
turn any packing material to the shipping container and save it for future use.
Step 3 V
erify that you have received the items listed below. If any item is missing or damaged, contact
your Cisco representative or reseller for instructions.
–
The access point.
–
Cisco local power supply kit, with the AIR-PWR-D power adapter and power cord.
The AIR-PWR-D power supply kit, containing the power adapter and the power cord can be also be
separately ordered from Cisco.