EasyManuals Logo

Cisco ASR 9006 Unpacking And Installing

Cisco ASR 9006
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #48 background imageLoading...
Page #48 background image
Figure 44: Removing a Line Card from the Cisco ASR 9912 Router Top Card Cage
Slide the card out of
the chassis.
3Pivot the ejector
levers outward to
unseat the card from
the backplane
connector.
2Loosen the captive
screws.
1
Step 4 Repeat Step 2 or Step 3 for each FC, LC, and RP card.
Rack-Mounting the Router Chassis
The router chassis is installed in a front-mounted position, as shown in the Telco 2-Post Rack section.
In a front-mounted position, the chassis rack-mounting flanges are secured directly to the rack posts.
The Cisco ASR 9922 Router and Cisco ASR 9912 Router are designed to mount in only 4-post racks.
Note
Unpacking and Installing the Chassis
48
Unpacking and Installing the Chassis
Rack-Mounting the Router Chassis

Table of Contents

Other manuals for Cisco ASR 9006

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco ASR 9006 and is the answer not in the manual?

Cisco ASR 9006 Specifications

General IconGeneral
Chassis TypeModular
Rack Units10 RU
Slots6
Operating Temperature0°C to 40°C (32°F to 104°F)
Storage Temperature-40°C to 70°C (-40°F to 158°F)
Relative Humidity5% to 95% non-condensing
Power SupplyAC or DC
CoolingFront-to-back airflow
Input Voltage100-240 VAC or -48 to -60 VDC
Supported ProtocolsIPv4, IPv6, MPLS, L2VPN, L3VPN
Interfaces10GE, 40GE, 100GE
Management InterfacesEthernet, Console, Auxiliary

Related product manuals