Telco and EIA Shelf Bracket optional kit is not provided with the switch; to order the kit, contact your switch
supplier.
Note
This section describes the procedure for installing a switch in a rack or cabinet using the optional Telco and
EIA Shelf Bracket Kit.
Shelf-Installation Guidelines
If the rack is on wheels, ensure that the brakes are engaged or the rack is otherwise stabilized.
If you are installing this kit in an EIA rack, attach the shelf to all four rack-mounting posts; the EIA posts
may not be thick enough to prevent flexing of shelf brackets if only two posts are used.
Caution
Before Installing the Shelf Brackets
Before installing the shelf brackets, inspect the contents of your kit. The following table lists the contents of
the shelf bracket kit:
Part DescriptionQuantity
Slider brackets2
Shelf brackets2
Crossbar1
10-32 x 3/8-in. Phillips pan-head screws2
12-24 x 3/4-in. Phillips screws16
10-24 x 3/4-in. Phillips screws16
Required Equipment
You need the following equipment for this installation:
Number 2 Phillips screwdriver
Tape measure and level (to ensure that shelf brackets are at level with each other)
Installing the Shelf Bracket Kit into a Four-Post EIA Rack
The following figure shows the installation of the shelf bracket kit into a four-post EIA rack: