Figure 10: Align the Lifting Device In Front of the Chassis on the Pallet
Step 2 Prepare to use the mechanical lifting device by placing a piece of cardboard on the surface of the lift (to prevent scratching).
Step 3 With at least two or three people move the chassis carefully from the pallet onto the lifting device as shown in Figure 11:
Move the Chassis On To the Lifting Device , on page 36 .
Hardware Installation Guide for Cisco NCS 5500 Series Modular Routers
35
Install the Chassis
Transfer Chassis to a Mechanical Lifting Device