EasyManua.ls Logo

Cisco Router Cisco IOS XR - Bringing Up and Verifying FCCs

Cisco Router Cisco IOS XR
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-34
Cisco IOS XR Getting Started Guide
OL-10957-02
Chapter 3 Bringing Up the Cisco IOS XR Software on a Multishelf System
Bringing Up and Verifying FCCs
oim count 1
oim instance 0 location F1/SM9/FM
!
controllers fabric plane 4
oim count 1
oim instance 0 location F2/SM0/FM
!
controllers fabric plane 5
oim count 1
oim instance 0 location F2/SM9/FM
!
controllers fabric plane 6
oim count 1
oim instance 0 location F3/SM0/FM
!
controllers fabric plane 7
oim count 1
oim instance 0 location F3/SM9/FM
!
end
Bringing Up and Verifying FCCs
When Rack 0 is up and configured to support the rack number and FCC fabric plane plans, it is time to
bring up and configure the FCC in the multishelf system as described in the following procedure.
SUMMARY STEPS
1. Apply power to all FCCs.
2. show controllers fabric rack all detail
3. show controllers fabric plane all detail
4. show controllers fabric connectivity all detail
5. On the external Catalyst switches, verify that the links are not unidirectional.

Table of Contents

Related product manuals