EasyManua.ls Logo

Civco Astra Tee - User Manual

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Installation Manual
Transesophageal Probe Reprocessor
Manufactured by:
CIVCOMedical Solutions
102 First Street South
Kalona, IA 52247 USA
319.248.6757 / 800.445.6741
WWW.CIVCO.COM
Copyright © 2020 All Rights Reserved.
ASTRA TEE is a registered trademark of CIVCO Medical Solutions.
All other trademarks are property of their respective owners.
Printed in the USA.

Other manuals for Civco Astra Tee

Question and Answer IconNeed help?

Do you have a question about the Civco Astra Tee and is the answer not in the manual?

Summary

SECTION 1: INSTALLATION MANUAL

SECTION 2: WARNINGS & CAUTIONS

CAUTION: Hot Surface

Warning about hot surface on HLD warmer plate, use caution.

SECTION 3: SITE REQUIREMENTS & SPECIFICATIONS

Physical Dimensions and Clearances

Physical dimensions of the unit and required clearances for operation.

Electrical Requirements

Details electrical specifications and connection needs for installation.

Water Supply Requirements

Specifies water supply connection needs, pressure, and temperature.

Drain Requirements

Details requirements for waste drain connection, including back-siphonage protection.

Environmental Requirements

Outlines operating environmental conditions like altitude, temperature, and humidity.

Long Term Storage Recommendations

Provides guidance for storing the device long-term.

SECTION 4: PARTS REQUIRED

Electrical Leakage Test Caution

Device must pass hospital's electrical leakage test before use.

Included Parts List

Lists all parts supplied by CIVCO Medical Solutions with the ASTRA TEE.

External Parts List

Lists essential parts required but not supplied by CIVCO.

SECTION 5: INSTALLATION

Typical Installation Overview

Describes a standard installation process for the ASTRA TEE unit.

Mounting the Unit Wall Bracket

Instructions for mounting the unit's wall bracket securely.

Mounting Probe Connector Holders

Details how to attach the probe connector holders to the unit.

Plumbing Installation

Covers plumbing connection requirements and compliance with codes.

Water Supply Connection

Steps for connecting the device to the potable cold-water supply.

Drain Connection

Instructions for connecting the device to the sanitary waste drain.

Electrical Connection

Details the process for electrical hookup, grounding, and power switch activation.

SECTION 6: INSTALLATION CHECKLIST

Electrical and Plumbing Checks

Checklist items for verifying electrical and plumbing installations.

Physical and Environmental Checks

Checklist items for verifying physical placement and environmental conditions.

Other Installation Checklist Items

Checklist items for parts, HLD, expiration dates, and probe models.

SECTION 7: INSTALLATION SCHEMATIC;REQUIREMENTS

Installation Requirements Summary

Summarizes electrical, water, and drain requirements for installation.

Parts List for Installation

Lists parts supplied by CIVCO and required external parts for installation.

Installation Schematics

Visual diagrams illustrating the overall installation layout and dimensions.

Civco Astra Tee Specifications

General IconGeneral
BrandCivco
ModelAstra Tee
CategoryMedical Equipment
LanguageEnglish

Related product manuals