EasyManua.ls Logo

CLIVET CF-V 101

CLIVET CF-V 101
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
CF-V 31-41-51-71-91-101-
121-142-182-202-242
VERTICAL WATER DUCTABLE TERMINAL UNIT WITH DECORATIVE
CABINET
M23740N6-03 01/10/07
Question and Answer IconNeed help?

Do you have a question about the CLIVET CF-V 101 and is the answer not in the manual?

CLIVET CF-V 101 Specifications

General IconGeneral
BrandCLIVET
ModelCF-V 101
CategoryTouch terminals
LanguageEnglish

Summary

UNIT IDENTIFICATION

General Warnings, Safety, and Regulations

Installation and Personnel Safety

Requirements for expert installation, local safety, power supply, and packaging.

Operational Precautions

Precautions for maintenance, inspections, and handling faults.

Additional Safety and Regulatory Information

Specific measures to prevent risks, and information on ISO 9001 and CE marking.

Residual Risks Overview

Danger Areas and Handling Risks

Identifies danger zones and risks associated with unit handling.

Installation and Electrical Risks

Hazards related to incorrect installation and electrical system connections.

Residual Risks (Continued)

Moving Parts and Water System Hazards

Risks from contact with moving parts and potential water leaks or sprays.

Water Connections and System Requirements

Piping, Valves, Supports, and Freeze Prevention

Guidelines for piping, valves, supports, anti-vibration devices, and preventing water freezing.

Electrical Connection Procedures

General Requirements and Data

Requirements for electrical lines, components, unit data, and supply protection.

Signal Lines and Mains Connection

Guidelines for signal cables and step-by-step mains connection procedure.

Functional Connections: Fan Control

3-Speed Fan Control System

Control of fan speed via a 3-speed board, selector, or potentiometer.

Client Electrical Connections

Remote and Networked Controls

Connections for remote controls, valves, shutters, thermostats, and RS485 serial line.

Unit Start-Up Procedures

Pre-Start-Up Checks

Essential checks before performing unit start-up.

System Verification

Verification of aeraulic, water, and electrical systems before operation.

Operational Verification Steps

Verifying tensions, absorptions, remote inputs, and set-points during operation.

Unit Control System

Alarms and Parameter Access

Visible Alarms and Malfunctions

Explanation of visible alarms, codes, and their meanings.

Accessing and Modifying Parameters

Procedure for accessing and modifying unit parameters.

Electric Resistances and Dehumidification

Electric Resistance Operating Modes

Overview of electric resistance modes and their parameters.

Routine Maintenance Overview

Maintenance Inspections and Standby

Troubleshooting Unit Issues

Technical Data Specifications

Related product manuals