Chapter 3: Product Installation
BEFORE INSTALLATION CHECKLIST
Before beginning the installation ensure that the following has been done:
1. The GSM/GPRS signal strength of the area must be tested to ensure that there is
appropriate signal strength for the unit to function optimally.
Always ensure your signal is above 20 for a consistent GPRS and GSM
connectivity.
2. Before removing the unit from the box, test the 220V feed to ensure that it is within
safe specifications and that it is earthed correctly.
UNSAFE WORKING PRACTICES AROUND ELECTRICITY CAN CAUSE
SERIOUS INJURY OR DEATH.
Do not connect the earth on the same line as the electric fence
energiser. Doing this may cause serious damage to the unit which in
turn may nullify the warranty.
3. Ensure that the inline lighting protector has been fitted correctly and is in working
order.
4. Before installing the unit ensure that the main circuit breaker is off.
UNSAFE WORKING PRACTICES AROUND ELECTRICITY CAN CAUSE
SERIOUS INJURY OR DEATH.
REQUIRED TOOLS, FASTNERS AND EQUIPMENT
The following tools and equipment is required to install the MKII:
1. 3 mm Flat Screw Driver.
2. 5.5 mm Alan Key.
3. 5.5 mm Nut Drive.
4. 5 mm Philips Screw Driver.
5. 8 mm Socket Drive.
6. 8 mm Socket Drive.
7. Power drill (Wall Mounting).
8. Six (6) M8 5 mm stainless steel countersunk bolts and nuts (minimum length 15 mm).
9. 8 mm Masonry Drill Bit (Wall Mounting).
10. Three (3) 8 mm Rawl bolts (Wall Mounting).