INSTALLATION HANDOVER
Installer must ensure that a proper handover is conducted. The attached checklist must be
completed and send back to Comb-Communications within five (5) working days of
installation.
Failure to submit the completed handover checklist may nullify the
warranty of the unit.
Installation and Handover Checklist
1. GSM/GPRS Signal has been tested.
2. The electricity feed from the
distribution board to the unit has been
tested and is within the safe operating
parameters.
3. An inline lighting protector has been
fitted and is in an operating condition.
4. The unit receives GSM/GPRS signal.
5. The earth wire connecting to the
cover plate has been secured.
6. The earth wire connecting the PCB to
the mounting plate is in place and
secure.
7. The speaker connection has been
fitted to the PCB.
8. The microphone connection has been
fitted to the PCB.
9. The ribbon has been connected to the
PCB.
10. The SIM card is activated.
11. The SIM card is properly installed on
the PCB.
12. The microphone has been tested and
is in working condition.
13. Keys to the unit has been handed
over to the end-user.
14. On-line login details and registration