EasyManua.ls Logo

Compak F8 - 7.4. INSTALLING THE COFFEE GRINDER

Default Icon
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ORIGINAL INSTRUCTIONS | QUALITY PROCESS REF. | V. 09|10|2020 | K07185
13
7.3. WHERE TO USE IT
The appliance must be installed on a
solid. at surface.
The minimum size for the
working space, to ensure you
get the best performance from
the machine, must be the following:
Height
730
28.74
mm
in
Width
235
9.05
mm
in
Depth
420
16.75
mm
in
Install the grinders on tables that are
completely level and in areas free
from external vibrations
Install the grinders in areas where
there are installations with a ground
connection.
Avoid places where abrupt changes
in temperature, humidity or airow
may occur.
7. INSTALLATION
7.4. INSTALLING THE COFFEE GRINDER
Before connecting the coffee grinder, check
the following:
The characteristics on the data plate
must match those of the electrical
mains network.
The electrical connection plug
matches the socket into which it is to
be plugged.
Ensure that the electrical power of
the facility is adequate for the power
consumed by the appliance.
The point of connection to the
electrical mains network must be
protected with the appropriate
electrical protection device.
The equipment must be correctly
connected to a ground connection
according to the current safety
regulations.
There is an equipotential connection
in accordance with the provisions
of current regulations, in order to
avoid electrostatic build-up. The user
must then connect this to the various
other pieces of equipment or connect
it to a to a ground point, using the
terminal marked with the
symbol
(according to the UNE-EN 60335-2-
102:2016 standard).
NOTE: This coffee grinder should
not be installed in places (SUCH AS
INDUSTRIAL KITCHENS) where are
expected to be cleaned using water jets.

Related product manuals