EasyManua.ls Logo

compupool products Compu Chlor - Installation Checklist; Cell Housing Installation Verification; Cell Collar Tightening Confirmation; Power Module Mounting Check

compupool products Compu Chlor
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Compu Chlor Manual AU 13
8.0 INSTALLATION CHECKLIST
8.1.1 Cell Housing correctly installed and glued into pipe work.
8.1.2 Cell Collar firmly tightened down onto Cell Housing with gasket in place.
8.1.3 The Power Module is mounted and secured in place on the mounting screws.
8.1.4 The Power Module is plugged into a weatherproof power outlet.
8.1.5 The Cell Cable wires are securely connected to the Power Module.
8.1.6 Sufficient salt has previously been added and fully dissolved into pool water.
8.1.7 You have checked and confirmed that the pump switches ON and OFF with the
Power Module.
8.1.8 You have checked all connections and joints for leaks.

Related product manuals