EasyManua.ls Logo

CORNING PCH-02U - Tools and Materials Required; Tools; Materials

Default Icon
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STANDARD RECOMMENDED PROCEDURE 003-722 | ISSUE 4 | OCTOBER 2015 | PAGE 3 OF 10
Figure 2
3. Tools and Materials Required
3.1 Tools
Phillips screwdriver
Flat-tipped screwdriver
5/16-in socket or wrench
11/32-in socket or wrench
Needle-nosed pliers
Cable stripping tools
3.2 Materials
Depending on your application, the following materials may be required:
Preconnectorized adapter panels
Universal cable clamp (p/n FDC-CABLE GRND to ground armored cable)
Buffer tube fanout (BTF) kits
Splice tray bracket kit (p/n PC2-SPLC-6SR)
KPA-0148
Locations for hook-and-loop strap
Locations for hook-and-loop strap
Removable door lock plug
Rear tray stop latch
Front tray stop latch
Jumper routing clips
Radius control guide
Mounting bracket
(shown in standard
5-in frontal projection)
Note: Top removed for clarity