COTES C35 OPERATING AND SERVICE HANDBOOK page 32/71
Things to be careful about
Electrical work should only be carried out by an authorised electrician.
Connections needed electrical
First, make sure that the main switch is OFF.
Now the power circuit cable can be connected to the main switch of the dehumidifier.
Connections needed ductwork
The ductwork for the process air should be selected with regard to the external pressure available
from the process air fan and the space available for ducting. A 250mm-diameter duct is normally
recommended for the process air flow.
When installed, the process air flow should be adjusted by means of a damper.
NOTE
Electrical work should only be carried out by an authorised electrician.
NOTE
Make sure power is switched off before installing and servicing.
NOTE
The electrical board may include circuits that can retain a charge even if the mains power is
disconnected. Detailed information about these electrical circuits is provided in the electrical
diagram on drawing no. 270.
NOTE
To ensure low pressure drop and low sound pressure levels, please request assistance
from a company that specialises in ductwork.