EasyManua.ls Logo

CPI CMP 200 - User Manual

CPI CMP 200
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
CPI Canada Inc. Installation 2
CHAPTER 2
INSTALLATION
CONTENTS:
2.1.0
INTRODUCTION ...................................................................................................................................... 2-2
2.2.0 UNPACKING ............................................................................................................................................ 2-2
2.3.0 REMOVING THE GENERATOR COVER ................................................................................................. 2-2
2.4.0 MAJOR COMPONENT LAYOUT .............................................................................................................. 2-3
2.5.0 EQUIPMENT PLACEMENT ..................................................................................................................... 2-3
2.5.1 Main Cabinet ......................................................................................................................................... 2-3
2.5.2 Control Console .................................................................................................................................... 2-3
2.5.3 Anchoring the Generator to the Floor ................................................................................................... 2-5
2.6.0 WIRING TO THE GENERATOR ............................................................................................................... 2-5
2.6.1 Control Console .................................................................................................................................... 2-6
2.6.2 Hand Switch (Optional) ......................................................................................................................... 2-9
2.6.3 X-ray Tube Stator Cable ..................................................................................................................... 2-10
2.6.4 Checking the Connection of the X-ray Tube Stator Cable .................................................................. 2-12
2.6.5 Power Line Mains................................................................................................................................ 2-12
2.6.6 High Voltage Cables ........................................................................................................................... 2-15
2.6.7 X-Ray Tube Housing Ground .............................................................................................................. 2-17
2.6.8 Room Equipment ................................................................................................................................ 2-17
2.6.9 Emergency Power Off / Power Distribution Relay .............................................................................. 2-17
2.6.10 Safety Interlocks.................................................................................................................................. 2-17
2.7.0 LOW-SPEED STARTER TUBE COMPATIBILITY .................................................................................. 2-17
2.7.1 Setting 120 / 240 VAC Boost Voltage ................................................................................................. 2-18
2.8.0 PROGRAMMING THE DUAL-SPEED STARTER .................................................................................. 2-18
2.8.1 EPROM type / dual-speed starter - applies only to DSS Board #728877-06. .................................... 2-19
2.8.2 Tube type setting on DIP switch SW1 for DSS Boards #728877-06 and #903132-02 ....................... 2-20
2.8.3 Programming DIP switch SW3 for DSS Board #903132-xx .............................................................. 2-23
2.8.4 Inspecting DIP switch SW8 setting for DSS Board #903132-xx ......................................................... 2-26
2.8.5 Configuring dual-speed starter 901297-15 / 901298-15 ..................................................................... 2-27
2.9.0 GENERATOR CONTROL BOARD DIP SWITCH SETTINGS ................................................................ 2-28
2.10.0 INITIAL RUN-UP ..................................................................................................................................... 2-28
2.10.1 Auxiliary Transformer Line Voltage Tap Selection .............................................................................. 2-28
2.10.2 Initial Voltage Measurements .............................................................................................................. 2-30
2.11.0 TUBE MA AUTO CALIBRATION ............................................................................................................. 2-31
2.12.0 FINAL CHECKS ...................................................................................................................................... 2-31
Use and disclosure is subject to the restrictions on the title page of this CPI document.
CMP 200
X-Ray Generator Service Manual Ch # 901476-02 Rev. P Page 2-1
Question and Answer IconNeed help?

Do you have a question about the CPI CMP 200 and is the answer not in the manual?

Summary

Chapter 2 Installation

2.6.0 Wiring to the Generator

Instructions for routing and connecting various cables, including control console, stator, power lines, and high voltage cables.

2.6.3 X-ray Tube Stator Cable

Procedures for connecting the X-ray tube stator cable to the generator.

2.6.5 Power Line Mains

Detailed guide for connecting the AC mains power supply to the generator.

2.6.6 High Voltage Cables

Instructions for connecting the high voltage cables to the X-ray tube sockets.

2.8.0 Programming the Dual-Speed Starter

Procedures for programming dual-speed starters, including EPROM types and DIP switch settings.

2.8.2 Tube Type Setting on DIP Switch SW1

Setting DIP switch SW1 to match the installed X-ray tube type.

2.8.3 Programming DIP Switch SW3

Configuring DIP switch SW3 for line input voltage and capacitor settings.

2.10.0 Initial Run-Up

Procedures for initial power-on, including auxiliary transformer voltage tap selection and voltage measurements.

2.11.0 Tube mA Auto Calibration

Performing the auto calibration cycle for the X-ray tube.

CPI CMP 200 Specifications

General IconGeneral
BrandCPI
ModelCMP 200
CategoryMedical Equipment
LanguageEnglish

Related product manuals