11
Starting Extra Regeneration Cycle
1. To Start Delayed Extra Cycle
- Press and hold the Set/Change button for 3 seconds until the display reads ‘0000’
- Regeneration cycle will initiate at the next designated regeneration time.
2. To start Immediate Extra Cycle First complete above step.
- With Gallons Remaining Until Next Regeneration at ‘0000’,
- Press and hold the Set/Change button.
- After 3 seconds, the regeneration cycle will begin.
3. To Fast Cycle thru regeneration First complete above 2 steps.
Note: Press and hold the Set/Change button for 3 seconds to advance to the next cycle step.
Fast Cycle is not necessary unless desired to manually step through each cycle step.
(Repeat until valve returns to the home display)
Start Up Procedure
Normal Operation
1. Home Display
The RS1 model will alternate the Time of Day and Gallons left until the next regeneration. The meter will
count down to zero (0000) and then regenerate at the scheduled time set.
Softeners Default (Min)
Step 1 Backwash 10
Step 2 Brine & Rinse 60
Step 3 Rapid Rinse 10
Step 4 Brine Rell 9 lbs/ cu ft