Power Up the Brewer
12 Turn on the water supply valve.
13 Turn on the circuit breaker supplying power to the
brewer.
14 Turn the power switch on the right side of the brewer
UPUIF0/QPTJUJPO5IFXBUFSUBOLXJMMTUBSUUPmMM8IJMF
UIFUBOLJTmMMJOHJOTQFDUUIFXBUFSTVQQMZMJOFGPSMFBLT
15 Go to the PROGRAMMING GUIDE section and
program the brewer for the correct model and batch
number.
16 When the water level in the tank rises to the correct
volume, the heating elements will turn on automatically.
Depending on the brewer capacity, the incoming water
UFNQFSBUVSFBOEUIFFMFDUSJDBMTQFDJmDBUJPOTUIFXBUFS
tank typically requires about 25 to 45 minutes to reach
the factory set operating temperature. When the water
has heated, “Ready to Brew” should be on the display.
17 #FGPSFCSFXJOHGPSUIFmSTUUJNFEJTQFOTFP[-PG
hot water through the hot water faucet to help purge air
from the tubing inside the brewer.
18 Brew a cycle of at least 192 oz./6 L to purge any
remaining air from the tubing. See OPERATING
INSTRUCTIONS. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIF
TPVOETPGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOE
water tank.
0.&("*/45"--"5*0/*/4536$5*0/4ø 032320C
INSTALLATION INSTRUCTIONS II6
IMPORTANT: When operating the brewer at
higher elevations, reduce the factory set operating
temperature (200°F/92°C) by 2°F/1°C for each
1000 ft./300 m of elevation above 4000 ft./1200 m.
See PROGRAMMING GUIDE.
3RZHUVZLWFK