INSTALLATION INSTRUCTIONS II15
Power Up the Brewer
10 Turn on the water supply valve.
11 Make sure that the circuit breaker supplying power to
the unit is on.
12 Turn the toggle switch on the back of the brewer to the
0/QPTJUJPO5IFXBUFSUBOLXJMMTUBSUUPmMM8IJMFUIF
UBOLJTmMMJOHJOTQFDUUIFXBUFSTVQQMZMJOFGPSMFBLT
13 If the control panel is not already lit, push the ON/
0''CVUUPO8IFOUIFXBUFSMFWFMJOUIFUBOLSJTFT
to the correct volume, the heating elements will turn
on automatically. Depending on the incoming water
UFNQFSBUVSFBOEUIFFMFDUSJDBMTQFDJmDBUJPOTUIFXBUFS
tank typically requires 20 to 30 minutes to reach the
GBDUPSZTFUPQFSBUJOHUFNQFSBUVSF8IFOUIFXBUFSIBT
IFBUFEUIF3&"%:50#3&8MJHIUXJMMDPNFPO
14 #FGPSFCSFXJOHGPSUIFmSTUUJNFEJTQFOTFPVODFTPG
hot water through the hot water faucet to help purge air
from the tubing inside the brewer.
15 Brew a cycle of at least 12 ounces, to purge any
remaining air from the tubing. See OPERATING
INSTRUCTIONS. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIF
TPVOETPGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOE
water tank.
Connect the Brewer Wiring (cont.)
IMPORTANT: 8IFOPQFSBUJOHUIFCSFXFSBU
higher elevations, reduce the factory set operating
temperature by 2°F for each 1000 feet of elevation
above 4000 feet. See PROGRAMMING GUIDE.
(&.%*/45"--"5*0/*/4536$5*0/4ø 120517B