8 8IFOUIFXBUFSJOUIFUBOLSJTFTUPUIFDPSSFDUMFWFMUIF
heating element will turn on automatically. Depending
on the incoming water temperature and the electrical
TQFDJmDBUJPOTUIFXBUFSUBOLUZQJDBMMZSFRVJSFTUP
minutes to reach the factory set operating temperature.
8IFOUIFXBUFSIBTIFBUFEUIFREADY light on the
control panel will come on.
9 Perform a brew cycle of a least 12 ounces to purge
any remaining air from the system. See OPERATING
INSTRUCTIONS. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIF
TPVOETPGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOE
water tank.
INSTALLATION INSTRUCTIONS II19
TLP, INSTALLATION INSTRUCTIONS 112917A
Powering Up the Brewer (cont.)
IMPORTANT: 8IFOPQFSBUJOHUIFCSFXFSBU
higher elevations, reduce the factory set
PQFSBUJOHUFNQFSBUVSF¡'CZ¡'GPSFBDI
GFFUPGFMFWBUJPOBCPWFGFFU4FF
PROGRAMMING GUIDE.