Setting voltage point
back to utility source
when selecting “SBU
priority” or “Solar first”
in program 01
default 46.0V, 44.0V~51.2V Settable
Setting voltage point
back to battery mode
when selecting “SBU
priority” or “Solar first”
in program 01
default 54.0V, 48.0V~58.0V Settable
Charger source priority:
To configure charger source
priority
If this inverter is working in Line, Standby or Fault mode, charger
source can be programmed as below:
Solar energy will charge battery as first priority.
Utility will charge battery only when
solar energy is not available.
Utility will charge battery as first priority.
Solar energy will charge battery only
when utility power is not available.
Solar energy and utility will both charge
battery.
Solar energy will be the only charger
source no matter utility is available or not.
If this inverter is working in Battery mode or Power saving mode, only
solar energy can charge battery. Solar energy will charge battery if it's
available and sufficient.
Beeps while primary source
is interrupted
Overload bypass:
When enabled, the unit
will transfer to line mode
if overload occurs in
battery mode.
Bulk charging voltage
(C.V voltage).
If self-defined is
selected in program 5,
this program can be set
up
default 56.4V, 48.0V~58.4V Settable