EasyManua.ls Logo

Cypress Traveo II - 3 Operation Points and Locations; Power Supply

Cypress Traveo II
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Traveo II Starter Kit User Guide, Document Number: 002-25314 Rev. *B 11
3. Operation Points and Locations
3.1 Power Supply
Power is supplied to this board from USB with a resettable fuse.
The current consumption can be measured at J4. J4 is not mounted by default, and instead R24 is
mounted. To measure current consumption, remove R24 and mount J4.
Figure 3-1. MCU Power Supply Jumper Locations
R24, J4
USB micro
Bottom side
Resettable
Fuse

Related product manuals