EasyManua.ls Logo

D-Link DE-1824EI - Page 74

D-Link DE-1824EI
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10BASE-T Stackable Hubs
will halt, the Hub ID “A” indicator will flash, and the last frame lit in the
series will show what test failed.
The parts of the Power-on Self Test, and the indicator associated with each
part, are as follows:
1. PROM Test (Port 1 Frame) Tests the integrity of the hub’s internal
Read-Only Memory.
2. DRAM Test (Port 2 Frame) Tests the hub’s internal Random-
Access Memory.
3. LED Display Test (Port 3 Frame) Tests to make sure the front
panel display works properly. Failure of this test is not considered a
fatal error, and failure will not cause the hub to halt.
4. EEPROM Test (Port 4 Frame) Tests the hub’s internal parameter
storage memory. Failure of this test is not considered a fatal error,
and failure will not cause the hub to halt. Hub parameters may be
lost, however.
5. Flash Memory Test (Port 5 Frame) Tests the hub’s flash memory,
used for storing the hub’s run-time image.
6. Network Monitor SRAM (Port 6 Frame) Tests the memory used in
the hub for collecting network statistics.
7. DL-P2517B NIC Test (Port 7 Frame) Tests the hub’s internal
network interface controller, used for in-band SNMP and Telnet
communication over the Ethernet network.
8. Expansion Module Test (Port 8 Frame) Tests the expansion
module attached to the rear of the hub, if there is one. Failure of this
test is not considered a fatal error, and failure will not cause the hub to
halt.
If any of the self-test items fail, contact your technical service representative
for assistance.
B-2 Power-On Self Test

Table of Contents

Related product manuals