EasyManua.ls Logo

Daikin DV25PECB14 - Page 5

Daikin DV25PECB14
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Figure 2-1
WIRE TIE LOCATION TO BE SECURED
Figure 2-2
WIRE TIE LOCATION TO BE REMOVED
.59
(15 mm)
1.57
(40 mm)
2.36
(60 mm)
.59
15 mm)
Wire tie
Wire tie
Screw
2
1
3
4
Detail D
Detail C
D
C
5
Center
Support
Corner
Post
*Do not get the
trap to touch
the coil tubing
Bundle excess
wire and secure
it to the corner
post using screw mount
wire ties
(3) Secure the insulated connectors to
the corner using two screws and the
mounting wire ties provided.
(2) Connect the junction connectors
and slide the insulation over it.
Secure the insulation on the
junction using two wire ties.
(
1) Insert the junction-
connectors into the
insulation
Junction wires
Insulation
Insulation
Sensor wires
Screw
mount
wire tie
Screw
mount
wire tie
Screw
mount
wire tie
(Front view)
(Side view)
Screw
(Front view)
(Side view)

Related product manuals