EasyManua.ls Logo

Daikin EBBX-D9W - Page 160

Daikin EBBX-D9W
316 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11 | Configuration
Installer reference guide
160
ERLA11~16D + EBBH/X11+16D
Daikin Altherma 3 R W
4P643603-1B – 2022.05
Schedule/Control Description
[3.2] Additional zone >
Heating schedule
Schedule for when the system
is allowed to heat up the
additional zone in heating
mode.
Predefined schedules: 1
Activation screen: [3.1] Schedule
Possible actions:
Off: When the system is NOT allowed to heat
up the additional zone.
On: When the system is allowed to heat up the
additional zone.
[3.3] Additional zone >
Cooling schedule
Schedule for when the system
is allowed to cool down the
additional zone in cooling
mode.
Predefined schedules: 1
Activation screen: [3.1] Schedule
Possible actions:
Off: When the system is NOT allowed to cool
down the additional zone.
On: When the system is allowed to cool down
the additional zone.
[4.2] Space heating/
cooling > Operation mode
schedule
Schedule (per month) for when
to operate the unit in heating
mode and when in cooling
mode.
See "To set the space operation mode"[4193].
[5.5] Tank > Schedule
Schedule for the domestic hot
water tank temperature for
your normal domestic hot
water needs.
Predefined schedules: 1
Activation screen: Not applicable. This schedule
is automatically activated if the DHW mode is
one of the following:
Schedule only
Schedule + reheat
Possible actions:
Comfort: When to start heating the tank to
the user-defined preset value [5.2] Comfort
setpoint.
Eco: When to start heating the tank to the
user-defined preset value [5.3] Eco
setpoint.
Stop: When to stop heating the tank, even if
the desired tank temperature is not reached
yet.
Note: In Schedule + reheat mode, the
system also takes the user-defined preset value
[5.4] Reheat setpoint into account.

Table of Contents

Related product manuals