6 | Application guidelines
Installer reference guide
46
EWAA011~016DA + EWYA009~016DA
Packaged air-cooled water chillers
and packaged air to water heat pumps
4P620242-1 – 2020.06
(a)
In the software the power consumption data of both meters is added so you do NOT have
to set which meter covers which power consumption.
Exceptional cases. You can also use a second power meter if:
- The power range of one meter is insufficient.
- The power meter cannot easily be installed in the electrical cabinet.
- 230V and 400V three-phase grids are combined (very uncommon), because of
technical limitations of power meters.
Examples in case of normal kWh rate power supply
1 power meter is sufficient.
Outdoor unit (1N~) + external backup
heater kit (1N~ or 3N~)
=> b/b*: Single- or three-phase power
meter (depending on external backup
heater kit)
Outdoor unit (3N~) + external backup
heater kit (1N~ or 3N~)
=> b*: Three-phase power meter
ed*
5
8
0
1
5
0
0
0
A*
c*
a*
c/c*
f/f*
B/B*
b*
X5M/5+6
450896.005
* 3N~
A Outdoor unit
B External backup heater kit
a Electrical cabinet: Normal kWh rate power supply
b Power meter
c Overcurrent fuse
d Compressor module
e Hydro module
f Backup heater
Examples in case of preferential kWh rate power supply WITHOUT separate
normal kWh rate power supply
1 power meter is sufficient.